Utilizing our standalone snubbing units, Axis Energy Services is able to provide tube up services on wells with higher wellhead pressure at a less expensive rate than when using a traditional rig. With our standalone unit, we operate with less equipment at the wellhead, which reduces cost, and on a multi-well pad can move from well to well in less than two hours and be ready to run pipe again. In a recent job with snubbing unit S-40, Axis completed four wells running 10,000 ft. of tubing in each well in less than 36 hours.
To save money on your next tube up installations, please contact us and let us show you the Axis difference!
Contact:
Erik Coleman
Vice President of Sales
Erik.Coleman@axisofs.com
(432) 999-8617
Share This Article