News

Stay up to date on Axis Energy Services as we continue to deliver service excellence for the lifecycle of the well, from completions to interventions to our industry-leading P&A solutions.

Axis Provides Cost-Saving Tube Up Installations

Share This Article

Utilizing our standalone snubbing units, Axis Energy Services is able to provide tube up services on wells with higher wellhead pressure at a less expensive rate than when using a traditional rig.  With our standalone unit, we operate with less equipment at the wellhead, which reduces cost, and on a multi-well pad can move from well to well in less than two hours and be ready to run pipe again.  In a recent job with snubbing unit S-40, Axis completed four wells running 10,000 ft. of tubing in each well in less than 36 hours.

To save money on your next tube up installations, please contact us and let us show you the Axis difference!

Contact:
Erik Coleman
Vice President of Sales
Erik.Coleman@axisofs.com
(432) 999-8617

Two Axis Snubbing Units Rigged Up Simultaneously for Customer in the Northeast
July 10, 2020
World Oil Highlights Axis’ Unique Digital Rig Monitoring Technology Used to Improve Drilling Performance
July 14, 2020
Axis Adding Crown Lighting to More Completion Rig Packages
July 15, 2020