The first part of any drill out is spotting the equipment and getting the rig ready to go to work. Here are some shots of Axis preparing containment and spotting equipment for another frac plug drill out in West Texas. The logistical effort to get a location ready is complex as crews set up the equipment to back up and center the rig over the BOP. Our team was hard at work arranging the rig and full line of equipment properly around the wellhead.
We also have our 1500hp continuous-duty pumps out on location, which are custom-engineered for 24-hour drill out work.
We are now over the hole and ready to rig up for this job. Axis continues to do multiple drill outs for this major customer in both South and West Texas. We appreciate our customers and crews for the continuing opportunities!
Let us show you the Axis difference at your next drill out.
Contact:
Erik Coleman
Vice President of Sales
(432) 999-8617
Erik.Coleman@axisofs.com
Share This Article