News

Stay up to date on Axis Energy Services as we continue to deliver service excellence for the lifecycle of the well, from completions to interventions to our industry-leading P&A solutions.

Axis Utilizes Nitrogen in Well Cleanout

Share This Article

While performing a well cleanout for a customer in the Northeast, Axis utilized its nitrogen service units to gain circulation in a well that was presenting challenges returning fluid to the surface. Along with our nitrogen pumps, Axis had high-spec rig 55, snubbing unit S-40, and several pieces of support equipment on location, including a BOP stack, two 1500HP pumps, and a 40’ laydown machine.

When doing well cleanouts, oilfield service providers are often faced with circulation challenges where we are unable to get a reliable return of fluid to the surface.  Often, pumping a diverter material into the well will result in stable circulation, but at other times, as in the case of this well, diverter material simply doesn’t work.  In those cases, Nitrogen is pumped downhole to “energize” the fluid resulting in fluid circulation being established and maintained.  Axis deployed its nitrogen service units and within about one hour we had reestablished circulation so the well cleanout could continue.

Axis provides a broad range of services to ensure that we can get the job done.  Give us a call and let us tell you about the Axis difference!

Contact:
Erik Coleman
Vice President of Sales
Erik.Coleman@axisofs.com
(432) 999-8617

Axis Provides Cost-Saving Tube Up Installations
July 20, 2020
Axis Updates White Paper Highlighting the Advantages of Stick Pipe Drill Out Technologies
July 21, 2020
Axis Provides Expert Fishing Services for Stuck Coil Tubing Utilizing CORE Digital Platform
July 22, 2020