News

Stay up to date on Axis Energy Services as we continue to deliver service excellence for the lifecycle of the well, from completions to interventions to our industry-leading P&A solutions.

Axis Completes 23,000-ft. Stick Pipe Drill Out of Challenging Well in the Midland Basin: A Case Study

Share This Article

Every pad location represents different challenges when drilling out frac plugs based on downhole conditions, whether the customer is using stick pipe or coil tubing. Using our CORE digital platform, we completed a challenging 23,000-foot well in the Midland Basin that had a high probability of becoming stuck while drilling due to extremely low bottom hole pressure.

Read our recent case study that explores how we used the CORE system to get the job done without getting stuck and extending the customer’s timeline of the job.

Download the case study here.

Contact us to learn more about this job and how Axis can make a difference on your next project.

Contact:
Erik Coleman
Vice President of Sales
Erik.Coleman@axisofs.com
(432) 999-8617

Axis Back to Work in North Dakota
July 29, 2020
Axis High-Spec, High-Pressure BOP Rentals Business Expands, New Location and Shop Facility Supports Growth
July 30, 2020
Staying Cool in the Heat, Safety Tips for Preventing Heat-Related Illnesses
July 31, 2020