Axis Completes 23,000-ft. Stick Pipe Drill Out of Challenging Well in the Midland Basin: A Case Study
News
Stay up to date on Axis Energy Services as we continue to deliver service excellence for the lifecycle of the well, from completions to interventions to our industry-leading P&A solutions.
Axis Completes 23,000-ft. Stick Pipe Drill Out of Challenging Well in the Midland Basin: A Case Study
Every pad location represents different challenges when drilling out frac plugs based on downhole conditions, whether the customer is using stick pipe or coil tubing. Using our CORE digital platform, we completed a challenging 23,000-foot well in the Midland Basin that had a high probability of becoming stuck while drilling due to extremely low bottom hole pressure.
Read our recent case study that explores how we used the CORE system to get the job done without getting stuck and extending the customer’s timeline of the job.
Share This Article