News

Stay up to date on Axis Energy Services as we continue to deliver service excellence for the lifecycle of the well, from completions to interventions to our industry-leading P&A solutions.

Axis Pumps Pipeline Pigs and Chemicals in Two Lengthy Pipeline Sections

Share This Article

One of the services many people are not aware of is that Axis provides pumping services to pump inspection pigs and chemicals to support pipeline integrity inspection companies.  We recently provided the rate needed for launching logging pigs into two different sections of a customer’s pipeline—from East Texas to two different Texas locations.  The first section covered nearly 150 miles from Teague, Texas to North Houston, and the second section stretched approximately 100 miles from Ringling, Oklahoma to Jacksboro, Texas.

These internal pipe inspection procedures are critical to ensure the integrity and safety of the pipeline, and Axis worked alongside a pipeline integrity company to perform the work successfully. Two different chemicals were pumped, along with a batch of logging equipment to record and inspect each section of pipeline. Our experienced Pumping Services team provided continuous and reliable pumping support as required by our customer.

Please contact us to learn about our many services and let us show you the Axis difference!

Contact:
Erik Coleman
Vice President of Sales
(432) 999-8617
Erik.Coleman@axisofs.com

Employee Spotlight Q&A: Tommy Diviney
September 25, 2020
Axis Supports Texas Oilfield Angels’ as Gold Sponsor at the 2020 People’s Choice Cook-Off
September 29, 2020
Axis Provides Pre-Load Fluid Pumping Services for Customer in Louisiana
September 30, 2020